Friday, August 21, 2015

All change at La Gare du Vin

The lovely but leaky original roof

The new roof goes on and tiles cemented against the strong north wind


The inside looking out - a large door for the Salle d'Attente tasting room

White walls and black beams covered in soot from the steam engine

Walls and ceilings, windows and shutters and enough room to swing a few vats

The concrete floor going in
The water tower used to fill up the steam trains